Building Control Technical Documents

Approved Documents

Part A (Structural Safety)

Part A (Structural Safety)
» Download


Part B (Fire Safety) | Volume 1

Part B (Fire Safety) | Volume 1
» Download


Part B (Fire Safety) | Volume 2

Part B (Fire Safety) | Volume 2
» Download


Part C (Resistance to Contaminants and Moisture)

Part C (Resistance to Contaminants and Moisture)
» Download


Part D (Toxic Substances)

Part D (Toxic Substances)
» Download


Part E (Resistance to Sound)

Part E (Resistance to Sound)
» Download


Part F (Ventilation)

Part F (Ventilation)
» Download


Part G (Sanitation, Hot Water Safety and Water Efficiency)

Part G (Sanitation, Hot Water Safety and Water Efficiency)
» Download


Part H (Drainage and Waste Disposal)

Part H (Drainage and Waste Disposal)
» Download


Part J (Heat Producing Appliances)

Part J (Heat Producing Appliances)
» Download


Part K (Protection From Falling, Collision and Impact)

Part K (Protection From Falling, Collision and Impact)
» Download

Part L1A (Conservation of Fuel and Power) | New Dwellings

Part L1A (Conservation of Fuel and Power) | New Dwellings
» Download


Part L1B (Conservation of Fuel and Power) | Existing Dwellings

Part L1B (Conservation of Fuel and Power) | Existing Dwellings
» Download


Part L2A (Conservation of Fuel and Power) | New Buildings Other Than Dwellings

Part L2A (Conservation of Fuel and Power) | New Buildings Other Than Dwellings
» Download


Part L2B (Conservation of Fuel and Power) | Existing Buildings Other Than Dwellings

Part L2B (Conservation of Fuel and Power) | Existing Buildings Other Than Dwellings
» Download


Part M (Access to and Use of Buildings)

Part M (Access to and use of buildings – Vol 1 ‘dwellings’)
» Download


Part M (Access to and Use of Buildings)

Part M (Access to and use of buildings – Vol 2 ‘buildings other than dwellings’)
» Download


Part P (Electrical Safety)

Part P (Electrical Safety)
» Download


Part R1 In-building Physical Infrastructure

Part R1 In-building Physical Infrastructure
» Download


Part P (Electrical Safety)

Part Q (Security)
» Download


Approved Document to Support Regulation 7 (Material and Workmanship)

Approved Document to Support Regulation 7 (Material and Workmanship)
» Download

Association of Consultant Approved Inspectors RICS

Build Control Alliance

Guidance Documents

Mediation Documents

» Procedural Issues Mediation Scheme

» Mediator Panellist Notes

» Mediation Case (Commencement of Work – Removal of Roof)

» Mediation Case (Invalid Initial Notice – Commencement of Work)

» Mediation Case (Status of Initial Notice Following Commencement of Works)

General Documents

» Zero Carbon Hub: Builders’ Book – An Illustrated Guide to Building Energy Efficient Homes.

» Briefing Note – CSH Abolition

» Draft Guidance on The Construction (Design and Management) Regulations 2015

» A Guide to ESOS – Department of Energy & Climate Change (Sept 2014)

» Annual Report 2011/2012

» Value of Building Control

» Annual Report 2010/2011

» Glass Guarding and Restrictors to Low Level Windows Above Ground Floor Level in Dwellings

» Protected Entrance Halls

» Guidance on Changes

» Annual Report 2009/2010

» Commencement of Work

» Inital Notice Protocol

» Definition of 'Fully Filled Cavity Separating Wall'

» HSE Signed Agreement

» Commencement within the ‘5 day Period’

» Interim Guidance on the Transfer of Sewers to Water Companies Under The Flood and Water Management Act


Party Wall Surveying

Party Wall Surveying
Fee Quotation


Part of the Stroma Group